The first coat of paint is up, and the vinyl flooring was going in the two bathrooms, kitchen and foyer. The kitchen cabinets, counter tops and sink were in the garage so we got a quick peek (I can't believe I forgot to take a picture!) The gutters are up, and they are waiting on the second set of shutters (they had gotten broken in shipping the first time around) which are back ordered and should be in soon.
Here are a few pictures, but you can see the whole timeline here!
Adam's Man Cave
(the natural light down there is amazing for a basement room!)
Half wall from the great room into the Kitchen
(the nook in the back is an extra pantry space, and the opening is the hallway back to the other 2 bedrooms and 2nd bathroom)
Breakfast Nook
Window in the office!
Front Door / Foyer area
(the office is to the left, and master bedroom to the right)
No comments:
Post a Comment